Your questions answered · Dealing with a builder
What should be in a builder's quote,
line by line?
Two quotes for the same house can be a long way apart, and the difference is usually in what one of them left out. Here's what a complete quote for a knockdown rebuild should have in it, line by line, so you can compare like with like and see where a number is thin before you sign.
Compare like with likeThe quotePart of a bigger picture: the whole checklist for choosing a builder in Queensland.
Before the house
- Asbestos removal by a licensed contractor, with disposal.
- Demolition and site clearance, including old slabs, footings, sheds, the driveway.
- Disconnections: power, sewer capping by a licensed plumber, gas.
- Soil test and structural engineering for the footings and frame.
- Design and drawings, and any development application the overlays require.
- The certifier's fees for the building approval and the mandatory inspections.
Some builders show these as a separate “preliminaries” or “site” section; some leave demolition and asbestos to you. Either is fine as long as it's written down. What isn't fine is a quote that doesn't mention them.
The site
- Earthworks: cut and fill, and the removal of spoil.
- Retaining walls, engineered where they hold a slope.
- Stormwater drainage to the street or the easement, and any on-site detention required.
- Service connections: sewer, water, power to the new house, and the temporary builder's supply.
- Temporary fencing, site toilet, skips and the like.
On a sloping Bayside block the site section is where the honest quote and the optimistic quote part company. Why is here.
The structure
- Footings and slab to the engineer's design for the soil class, with termite management and the membrane; or posts, bearers and floor frame on a highset.
- Wall and roof frame, timber or steel, with bracing and tie-downs.
- Roofing, gutters, downpipes, fascia.
- External walls: cladding, brick, render, as specified.
- Windows and external doors, with the glazing certificate the certifier wants at the end.
- Stairs, decks and balustrades.
The inside
- Plumbing and drainage, and the hot water system.
- Electrical, switchboard, lighting, data, smoke alarms.
- Insulation to the energy efficiency requirements.
- Internal linings, cornices, doors, architraves and skirtings.
- Waterproofing to the wet areas, with its certificate.
- Joinery: kitchen, bathrooms, laundry, wardrobes.
- Tiling, painting, floor coverings, fit-off (tapware, fittings, appliances if included).
The outside and the paperwork
- Driveway and crossover, paths, clothesline, letterbox.
- Fencing and basic landscaping, or a clear statement that they're excluded.
- The Home Warranty premium, which the builder collects and pays to the QBCC.
- Insurances: contract works, public liability.
- The builder's margin and GST, and whether the total includes them.
The allowances
Listed separately, each with its estimate: tiles, tapware, appliances, lighting, sometimes the site works if the soil test isn't in yet. This is the part of the quote that behaves like an estimate rather than a price, and the QBCC's advice is direct.
“Allowances (items or services for which the price is not fixed when the contract is signed) should be kept to a minimum as the final cost often exceeds the estimate in the contract.” The QBCC's checklist asks you to check what proportion of the total is allowances.
Queensland Building and Construction Commission, Consumer Building Guide, version 3, effective July 2023. Count them. Ask why each one is there.
Where a quote is usually thin
- The site. Earthworks and retaining priced as if the block were flat, or as an allowance.
- The allowances. A cheap quote is often a quote with the real prices moved into a long allowance list.
- What's missing. No driveway, no fencing, no certifier, no Home Warranty line, no GST line. Every one of those turns up later as a cost.
The check is simple: put two quotes side by side and tick the lines above against each. The cheaper total is usually the shorter list.
Common questions
Should the quote have a total on the front?
The contract must, if the price is fixed: prominently, on the first page of the schedule. The quote is the working document that gets you there, and it should be clear whether its total includes GST and the allowances.
Is a longer quote always better?
A more complete one is. Length for its own sake isn't the point; the point is that every line above has an answer, even if the answer is “excluded, you're arranging it.”
Why do two builders' allowances differ so much?
Because an allowance is a guess about what you'll choose. One builder guesses low to win the job; another guesses at what families actually pick. Ask each one what their allowance would buy, in a shop you can walk into.
Will Sabre's quote have all of these lines?
Ask Nathan to lay it out against this list. Anything excluded will say so in writing, and every allowance will have a reason.
Sources: Queensland Building and Construction Commission, Consumer Building Guide (version 3, effective July 2023), on contract price, allowances and the Home Warranty premium; Queensland Building Regulation 2021 (mandatory inspection stages and certificates). Read 17 September 2026. This is a plain-English guide to the shape of a quote, from a builder. It contains no prices, and it is not financial or legal advice.
Where most families start
A walk through your house with Nathan.
Bring the other quote. Nathan will lay Sabre's beside it, line for line, and show you where they differ and why.
Book your walk-through with Nathan Call 0422 831 306
Already thinking about a rebuild? The free block check is on the same page.